Full overhaul

Recently we executed a complete overhaul on two hydraulic winches. The winches have been disassembled, inspected and the necessary parts have been replaced or remade. After assembly, the winches were succesfully subjected to a full load test.

This is how we make existing equipment new again. The following work is executed during the overhaul:

  • Complete disassembly
  • NDT inspection
  • Replacing bearing
  • Renewed coating
  • Test break load of wire rope
  • Fittings or new cable terminations
  • Full load test at 28 tons
Project Manager
Winches look great again! Well done team DÉGRA.